Fully separated engine
The 3 main blocks of the engine ready to be degreased, de-rusted and prep'd for machining and rebuild;
1. Head: open combustion chamber (shrouded ports), slightly larger valves, port the throats above the valves and unleaded conversion.
2. Block: check for damage, replace bearings (tbc), clean up ready for paint.
3. Gearbox: 4 pin diff, gaskets, balk rings and central oil pickup.
Hopefully won't be long to be ready to build it back up again!!!🤞
1. Head: open combustion chamber (shrouded ports), slightly larger valves, port the throats above the valves and unleaded conversion.
2. Block: check for damage, replace bearings (tbc), clean up ready for paint.
3. Gearbox: 4 pin diff, gaskets, balk rings and central oil pickup.
Hopefully won't be long to be ready to build it back up again!!!🤞
Comments
Post a Comment